Facebook, West End

The Numbers


Project Value

£9.3 million

Type


Mechanical Services

Start

Completion


January 2019


April 2018

Hit Like

  • Friend request.

    The end user required a new base to support its continually growing support staff and selected the 9 story building in the heart of London. The building was outdated and our client negotiated the project with Kentex Services, to provide a complete shell and core installation due to Kentex successful history of delivering such projects. Kentex also successfully designed in VE savings to our delighted client.

  • Create post.

    Kentex Services upon receipt of order produced a dynamic model of the building so that the new VRF system could be sized adequately to reduce energy consumption. A full HVAC & public health design was produced to all the latest water regulations/building regulations & CIBSE guidelines which was successfully signed off by the local building control.

    Kentex Services installed fresh air ventilation within 5No riser shafts including 7No roof mounted air handling units. All new WC facilities with leak detection were also installed to each level.

  • Add to your post?

    The positioning of over 100 roof mounted condensers, air handing units, silencers, ductwork, kitchen supply/extract fans and life safety smoke extract systems to the 7th,8th, 10th & 11th floors in the heart of London proved a very complex procedure. To make things worse our client also requested we lift their roof insulation, steel work and ballast to these areas. Kentex services provided a tower crane to a side ally in association with the local planning council and over the period of 4 weeks, successfully positioned all plant and materials which included various programmes being co-ordinated with the clients trades

    Our clients contracts director had the following to statement about our works on this project:

    ‘I can honestly say you have worked miracles on this project and advise that we have achieved pc with the landlord team at 11:50 pm’

  • Profile.

    Kentex Services successfully resourced and delivered the project’s following skills, experience and capabilities:

    Fresh air supply & extract ventilation
    New air handling units to plantrooms and roofs
    Commercial kitchen supply & extract ventilation utilising gas interlocking systems
    Fire rated kitchen extract ventilation ductwork c/w cleaning access
    VRF fan coil unit installation including ductwork
    VRF roof mounted condensers and associated refrigeration pipework
    BMS Controls including 7No control panel
    Air conditioning to 9No data room via a N+1 system
    Insulated rainwater system
    Public health drainage
    Boosted cold water to WC’s, kitchen and pantrys
    Gas fired water heaters including flue system to new kitchen
    Life safety smoke extract system interlocked with fire alarm
    Acoustic roof mounted silencers to AHU and kitchen plant designed in accordance with the local planning department
    Gas services installation
    Motorised fire/smoke dampers installation & control
    Testing & commissioning
    Insulation to services including fire rated insulation to kitchen extract